Also serving New Jersey— visit the New Jersey site
Aviation CRE Specialty · Houston

Houston Part 145

FAA Part 145 maintenance facilities — airframe, powerplant, avionics, interior. Finding the right site means understanding runway length, ramp access, utility capacity, environmental controls, and inspector flow.

About Houston Part 145 Repair Stations

Part 145 repair stations have requirements that generic industrial real estate rarely satisfies. The facility needs ramp access for the aircraft types the shop will service (which constrains the airport short-list immediately). It needs electrical capacity for test equipment, climate control for avionics and interior work, high-bay heights for tail access, environmental containment for solvents and paint, and often specialty-tool infrastructure. Add FSDO (Flight Standards District Office) inspector workflow considerations and site selection becomes a specialty project.

What I do on part 145 repair

  • Site selection for new Part 145 operations — which Houston-corridor fields match the aircraft class, inspector access, and operating model
  • Lease negotiation for existing shop facilities — ingress/egress rights, utility capacity, environmental allocation
  • Build-to-suit on ground lease at fields with sufficient ramp capacity
  • Expansion deals — adding bays, specialty shops, or paint capacity to an existing Part 145 footprint
  • Co-location strategy — FBO + Part 145 shared ramp arrangements, hangar sublets for maintenance providers
  • FSDO geography — understanding which FSDO owns which airports and how that affects inspector responsiveness

What to watch for

  • Door and bay height drive which aircraft the shop can service — a 24-foot door caps you at midsize jets
  • Ramp access must be direct — tenants sharing taxiway with transient traffic have operational friction every busy weekend
  • Electrical service (voltage, amperage, three-phase availability) is often undersized for test benches and specialty tooling
  • Environmental controls (paint booth air handling, solvent containment, HAZMAT storage) are capex-heavy — model them explicitly
  • FSDO inspector flow matters — if your inspector is based 90 minutes away, every scheduled surveillance costs the shop a day
  • Zoning: some airport-adjacent industrial parcels prohibit aircraft work despite being next to the fence — verify before signing

Part 145 Repair questions

Which Houston airports have the best Part 145 ecosystem?+

Hobby and Hooks are the most established — long-running shops, deep bench of experienced technicians, FBO infrastructure that supports maintenance workflows. Houston Executive is newer but has active development. Ellington is strongest for aerospace, government-contract, and special-mission Part 145 work, with the joint-use ATC environment that comes with it.

Can I run a Part 145 shop out of a non-airport industrial park?+

Only for component work (avionics boxes, interior panels, parts) where you don't need the aircraft at the shop. Full airframe or powerplant work requires airside access. Buyers / landlords sometimes conflate "industrial" and "aviation" — I'll help you avoid signing a lease you can't operate from.

What does Part 145 facility sizing look like?+

10,000 SF supports a focused specialty shop (avionics-only or interior-only). 25,000-50,000 SF supports a general airframe shop with 2-4 bays. 50,000-150,000 SF supports multi-bay heavy maintenance for midsize-to-large jets. Add 20-40% for office / support / parts storage beyond the hangar floor.

Looking at part 145 repair?

Happy to walk the market with you. One call, no pressure.

Angelo Mitlo · Sales Associate · KW Commercial · Clear Lake · TREC Salesperson #842584